Finance and project teams working from different numbers is the norm on capital projects. Strataverra connects every dollar to the physical progress it represents, so you see the real cost picture before period-end.
Cost data lives in the ERP. Progress lives in the scheduling tool. The two don't talk. The real picture only emerges at period-end, weeks after you could have acted.
Spend alone does not show how much work has been completed. Teams calculate CPI and SPI in separate spreadsheets, making it harder to compare the figures at the same reporting date.
Design changes cause 56% of cost overruns. Changes are raised informally, approved slowly, and their downstream cost impacts aren't visible until the next report.
Progress claims are built in spreadsheets that don't match the schedule or earned value, so what was actually done is hard to prove.
Strataverra gives you real-time earned value that connects every cost line to physical progress, so your project and finance teams work from the same numbers.
Real-time CPI and SPI that update as work progresses. Forecast at completion recalculates continuously, not at period-end.
Track committed, actual, and forecast costs at every level from the total project down to individual cost centres.
Review cost and schedule impact before approval. Route variations by value and import an existing variation register.
Keep a progress claim register with approvals and retention alongside the budget and earned value data.
EAC and ETC calculations update in real time based on actual performance. Contingency drawdown tracked and visualised.
Review spend by cost centre, discipline and contractor, then investigate the packages driving a variance.
Track each variation from an existing register or a new request through cost and schedule impact assessment.
Configure approval levels by value so each variation reaches the right level of review.
Bring an existing variation register into the connected cost picture.
Keep claims connected to completed work without relying on a separate spreadsheet.
Review and approve progress claims with a clear record of what has been claimed.
See retention alongside approved claims and the cost position.
over budget on large projects
McKinsey & Company, 2016
of cost overruns caused by design changes
KPMG Global Construction Survey
cost reduction from integrated project controls
McKinsey & Company
of project costs spent searching for information
FMI, Construction Disconnected (2018)
See how cost integrates with schedule, risk, quality, and document control.
Learn moreHow cost connects to risk analysis and change management workflows.
Learn moreFull platform overview for managing capital projects across industries.
Learn moreSee cost management in the context of large construction and EPCM projects.
Learn moreSPI, CPI, EAC, S-curves and a worked example.
Learn moreWork through the earned value formulas in your browser.
Learn more