    Project Cost Management Software That Connects Spend to Progress

    Finance and project teams working from different numbers is the norm on capital projects. Strataverra connects every dollar to the physical progress it represents, so you see the real cost picture before period-end.

    Large projects can run up to 80% over budget— McKinsey & Company, 2016
    The Problem

    Spending tells only part of the story.

    Finance and project teams disagree

    Cost data lives in the ERP. Progress lives in the scheduling tool. The two don't talk. The real picture only emerges at period-end, weeks after you could have acted.

    No earned value visibility

    Spend alone does not show how much work has been completed. Teams calculate CPI and SPI in separate spreadsheets, making it harder to compare the figures at the same reporting date.

    Change impacts are invisible

    Design changes cause 56% of cost overruns. Changes are raised informally, approved slowly, and their downstream cost impacts aren't visible until the next report.

    Claims disconnected from progress

    Progress claims are built in spreadsheets that don't match the schedule or earned value, so what was actually done is hard to prove.

    The Solution

    Know what the spend has earned, and where costs are heading.

    Strataverra gives you real-time earned value that connects every cost line to physical progress, so your project and finance teams work from the same numbers.

    Live earned value management

    Real-time CPI and SPI that update as work progresses. Forecast at completion recalculates continuously, not at period-end.

    Budget tracking with drill-down

    Track committed, actual, and forecast costs at every level from the total project down to individual cost centres.

    Variations and approvals

    Review cost and schedule impact before approval. Route variations by value and import an existing variation register.

    Progress claims and retention

    Keep a progress claim register with approvals and retention alongside the budget and earned value data.

    Cost forecasting

    EAC and ETC calculations update in real time based on actual performance. Contingency drawdown tracked and visualised.

    Cost dashboards by discipline

    Review spend by cost centre, discipline and contractor, then investigate the packages driving a variance.

    Variations with the impact in view

    Track each variation from an existing register or a new request through cost and schedule impact assessment.

    Approval by value

    Configure approval levels by value so each variation reaches the right level of review.

    Import your register

    Bring an existing variation register into the connected cost picture.

    Progress claims and retention

    Keep claims connected to completed work without relying on a separate spreadsheet.

    Claim register and approvals

    Review and approve progress claims with a clear record of what has been claimed.

    Retention

    See retention alongside approved claims and the cost position.

    Try the free earned value calculator
    Industry Research

    What the research says.

    Up to 80%

    over budget on large projects

    McKinsey & Company, 2016

    56%

    of cost overruns caused by design changes

    KPMG Global Construction Survey

    25%

    cost reduction from integrated project controls

    McKinsey & Company

    10%

    of project costs spent searching for information

    FMI, Construction Disconnected (2018)

    Comparison

    Traditional tools vs. Strataverra.

    Earned Value
    Manual calculation in spreadsheets, weeks late
    Real-time CPI/SPI linked to physical progress
    Budget Tracking
    ERP shows spend, not connected to deliverables
    Every cost line linked to its activity and budget
    Change Impact
    Cost impact calculated after approval
    Cost and schedule impact visible before sign-off
    Forecasting
    Monthly EAC update based on estimates
    Continuous EAC/ETC based on actual performance

    Review how your team manages cost.

    The free assessment covers cost forecasting alongside schedule, change control and other delivery practices. See your scores, indicative benchmarks and suggested next steps.