Quality management

    ITP and NCR software that keeps every hold point in view

    Build inspection and test plans, run inspections in the field, release hold points and close out non-conformances in one place, for construction, EPCM, shutdown and turnaround quality teams.

    Coming soon · Early access registration now open

    Illustrative preview with sample data.

    On most projects the quality record is a paper ITP, a folder of photos and an NCR spreadsheet. When someone asks whether a hold point was released before the pour, nobody can answer with confidence. Strataverra keeps the plan, the inspection and the NCR on one record.

    In plain terms

    An inspection and test plan (ITP) lists the checks a piece of work needs, who must witness them, and the hold points where work stops until someone releases it. A non-conformance report (NCR) records work that doesn't meet requirements and the action taken to fix it.

    Build a free ITP template in your browser
    What it does

    From the ITP to a closed NCR, in the order your team works.

    Build ITPs your crews can follow

    Set out each check with its hold, witness, review or record point, and see exactly what the inspector will see on a phone before the plan goes to site.

    • Hold, witness, review and record points
    • Phone preview before release
    • Reuse your organisation's ITP templates
    • Live ITP sheets on site

    Inspect in the field

    Inspectors record results on a phone with photos and voice notes. Crews still on paper can email a marked-up sheet back, and it becomes a draft for a person to confirm.

    • Photos and voice notes on each check
    • Marked-up sheets emailed back as drafts
    • Scan a printed sheet to confirm it is current
    • Inspection PDFs ready to send

    Stop work at hold points

    A hold point is released by the party named on the ITP, with a countersign where the client or a third party must accept it. Until then, the work can't be marked complete.

    • Sign-off and countersign steps
    • Work can't be completed past an open hold point
    • Progress can't run ahead of a failed hold point
    • Every release recorded with who and when

    Close out NCRs

    Raise a non-conformance, assign corrective actions and see how long each one has been open. Verra can draft the NCR wording from your notes for a person to review before it is saved.

    • Corrective actions with owners
    • Days open on every NCR
    • Critical NCRs listed oldest first
    • AI-drafted text, reviewed before use

    See quality across the project

    Open items, overdue inspections, inspection progress and trends sit on one quality dashboard, with reports scheduled for the people who need them.

    • Overdue inspections at a glance
    • Inspection progress
    • Quality trends over time
    • Scheduled quality reports

    Illustrations use sample data.

    How it works

    Five steps from plan to closed-out NCR.

    1. 1

      Plan

      Build the ITP from your template and set its hold and witness points.

    2. 2

      Release

      Issue it to site as a live sheet, or print it with a code that confirms it is current.

    3. 3

      Inspect

      Record each check with photos, notes and the right sign-off.

    4. 4

      Hold

      Work waits at a hold point until the named party releases it.

    5. 5

      Close

      Raise NCRs where checks fail, assign the fix and close them out.

    One platform, configured by project type

    Configured for the way your project runs

    EPCM projects

    Discipline ITPs for each work package, with witness points for the client and engineer, and the quality record kept with the work it belongs to.

    Shutdowns and turnarounds

    Inspections on equipment, welds and pressure tests inside a fixed window, with hold points released before work moves on and NCRs visible the same shift.

    Why trust it

    Built by people who have done the inspections

    From the tools

    Two of our founders started as electricians and went on to run projects and outages with 250+ people on site. We've stood at the hold point waiting for a signature.

    A record you can defend

    Every sign-off, countersign and change is kept with who made it and when, so the quality record holds up at handover or in a dispute.

    Your data stays yours

    Each organisation's data is kept separate, people only see what their role allows, and we don't use your data to train AI models.

    Questions teams ask

    Yes. Set each one up once as an organisation template in the ITP builder, then reuse it on every project. You can try the format first with our free ITP template.