    Spreadsheets vs project controls software

    Most projects run on spreadsheets at some point, and many run well on them. This page sets out where spreadsheets are the right tool, where they start to cost more than they save, and how to tell which side of that line your project is on.

    The short answer

    Spreadsheets suit a small project managed by a few people who built the workbooks. Once several teams, contractors and reporting periods depend on the same numbers, keeping the spreadsheets consistent usually takes more effort, and carries more risk, than the software that replaces them.

    An honest look

    Where spreadsheets work, and where they start to cost more

    When spreadsheets are the better choice

    • Small, short projects

      With a handful of people and a few months of work, the overhead of setting up software isn't worth it.

    • One-off analysis

      Modelling an option, checking a claim or building a quick estimate is faster in a spreadsheet than anywhere else.

    • Everyone already knows them

      No training, no licences and no setup. That matters when a team has to start tomorrow.

    • Complete flexibility

      A spreadsheet will do whatever you build it to do, which is ideal while a process is still being worked out.

    Where spreadsheets start to cost more

    • Copies multiply

      Files are emailed, saved locally and renamed. Before long nobody is sure which copy has the current numbers.

    • Cost and progress don't connect

      The cost report, the schedule and the progress measurement live in separate files, so earned value is rebuilt by hand every period.

    • One person holds it together

      Complex workbooks depend on whoever built them. When that person leaves or is away at month end, reporting stalls.

    • No record of who changed what

      A changed formula or overwritten figure leaves no trace, which makes audits and disputes harder.

    • Errors spread quietly

      A broken link or a wrong cell reference rarely announces itself, and the wrong number flows into every report built on it.

    Side by side

    How the two compare

    Cost to start
    SpreadsheetsNothing extra
    Project controls softwareLicences and setup time
    Flexibility
    SpreadsheetsUnlimited
    Project controls softwareWorks within the software's structure
    Current version
    SpreadsheetsDepends on file discipline
    Project controls softwareOne shared record
    Cost linked to progress
    SpreadsheetsRebuilt by hand each period
    Project controls softwareCalculated from the same data
    Change history
    SpreadsheetsUsually none
    Project controls softwareRecorded automatically
    Access control
    SpreadsheetsWhole file or nothing
    Project controls softwareSet by role and project
    Month-end reporting
    SpreadsheetsConsolidated manually
    Project controls softwareProduced from live data
    Reliance on key people
    SpreadsheetsHigh
    Project controls softwareLower
    A quick check

    Signs you have outgrown spreadsheets

    If two or three of these sound familiar, it's worth looking at the alternative.

    1. 1Month-end reporting takes days of consolidation before anyone can look at the numbers.
    2. 2People regularly ask which version of a file is the current one.
    3. 3Only one or two people can safely update the main workbooks.
    4. 4Earned value, if it's done at all, is recalculated by hand.
    5. 5A change in one place, such as an approved variation, has to be copied into several files.
    6. 6You have found a reporting error after it had already gone to a client or the board.
    Where Strataverra fits

    One connected record, launching first for EPCM, shutdowns and turnarounds

    Strataverra keeps schedule, cost, change, quality, risk and documents in one connected record, so earned value and reports come from the same data rather than from consolidated spreadsheets. Spreadsheets still have a place: you can export to Excel for your own analysis. Strataverra is launching first for EPCM projects, shutdowns and turnarounds.

    Explore the platform

    Common questions

    Can a large project be run on spreadsheets?

    It can, and many have been. The cost shows up as the time spent consolidating and checking files, the reliance on the people who built them, and the risk of an error reaching a report. The larger the project and the more parties involved, the more those costs grow.

    Will we have to stop using Excel?

    No. Spreadsheets remain the best tool for one-off analysis and modelling. The aim is to stop using them as the system of record that everyone's reports depend on.

    When is the right time to move off spreadsheets?

    The best time is between projects or at the start of a new phase, so the baseline is set up in the new system from the beginning. Moving part way through is possible but means migrating the baseline and history.