Free project controls tools · No sign-up required

    Free risk assessment and risk register template

    Set your risk criteria with a 3x3 to 6x6 matrix that matches your organisation's risk policy, build your risk register, and export it as a branded Excel workbook or PDF report.

    Built for project teams in construction, mining, oil and gas, energy, shutdown and turnaround work.

    How to use this template

    Follows the risk management process in AS ISO 31000:2018.

    1. 01

      Set risk criteria

      Matrix size, likelihood and consequence levels, ratings and required responses.

    2. 02

      Identify

      Describe each risk's cause, risk event and consequence.

    3. 03

      Analyse current risk

      Record existing controls and their effectiveness, then rate likelihood and consequence.

    4. 04

      Plan treatment

      Add actions with an owner and due date, working down the hierarchy of controls for safety risks.

    5. 05

      Evaluate residual risk

      Re-rate the risk after treatment and check the risk reduction.

    6. 06

      Monitor and review

      Set the next review date, record acceptance where needed, and export for reporting.

    A planning template, not an automated approval or risk prediction service. Manage safety risks through your WHS management system as well.

    Risk register

    Identify each risk, rate the current risk with existing controls, plan treatment actions, and evaluate the residual risk and risk reduction. Export your register as a branded Excel workbook or PDF report. Your register is saved in this browser only.

    1 Medium
    OpenRiskCurrent rating
    ExampleWorker falls from an extension ladderSafety · ScheduleMedium · 12

    Your register is saved in this browser on this device only, so it's still here when you refresh or come back. Other people and other devices start with a blank register. Export to Excel or PDF to keep a copy or share it.

    Response required by risk rating

    Critical
    Unacceptable. Act immediately to reduce the risk, stopping or not starting the activity if needed. Escalate to executive management. A treatment plan is required. Review at least monthly.
    High
    Tolerable only with senior management approval. A treatment plan is required to reduce the risk as low as reasonably practicable. Review at least every 3 months.
    Medium
    Acceptable with effective controls. Management responsibility must be specified; treat where cost-effective. Review at least every 6 months.
    Low
    Acceptable. Manage by routine procedures and monitor for change. Review at least every 12 months.

    Safety risks: Safety risks must still be eliminated or, if that isn't reasonably practicable, minimised so far as is reasonably practicable, whatever their rating.

    Sources and licences

    Verra's suggested safety causes, consequences and controls include material from the openly licensed Australian guidance below. Adapted by Strataverra: reworded and combined with general practice. The publishers do not endorse Strataverra or this template.

    Australian Standards are named by number and title only; their content is not reproduced. © 2026 Strataverra Pty Ltd (ABN 71 696 899 920). You may use and adapt this template for your own projects. The content you enter is yours.

    Export your risk register

    Branded and ready to share with your team, client or contractors.

    Building better project controls?

    Strataverra is launching with EPCM, shutdowns and turnarounds. Join the early access list for updates on the platform.