Buyer's guide

    Project controls software for oil and gas capital projects

    There is no single best system for every oil and gas capital project. The right one keeps cost, schedule, documents, quality and risk on the same baseline while an owner's team, an EPCM contractor and a turnaround crew are all in the work. This page is the criteria. It is not a ranking.

    The short answer

    Judge project controls software for oil and gas on three things: whether cost and the schedule share one cut-off date, whether document revisions and hold points are controlled records, and whether a turnaround can be run in the same system as the capital project. Strataverra is project controls software for that work. It is launching first for EPCM and for shutdowns and turnarounds. A dedicated oil and gas configuration is on the roadmap, not a product you can buy today.

    Criteria

    What to judge, on any product

    Use these on a demonstration, including a demonstration of Strataverra. A vendor that cannot show the record should not be scored on the slide that describes it.

    1. 1.Cost and the schedule on one baseline

      Budgets, commitments, actual cost, physical progress and the forecast have to share a cut-off date. If earned value is rebuilt in a workbook from a cost extract and a schedule extract taken on different days, the SPI and the EAC are a weak basis for a decision. Ask to see planned value, earned value, actual cost and the estimate at completion from the same records.

    2. 2.The owner's view across contractors

      Under EPCM the owner usually holds the construction contracts. The EPCM firm manages them. A system that only shows the EPCM's internal plan, or only one contractor's job cost, leaves the owner reconciling reports. The test is whether commitments, progress claims, variations and progress can be read by contract and still roll up to the project.

    3. 3.Revisions and transmittals

      A document revision is the version of the document. A transmittal is the record that a revision was sent to someone, for a stated purpose. Receipt is not approval. A dispute can turn on which revision was in the field. The system should show both, and should make a superseded revision obvious.

    4. 4.Hold points and witness points

      An inspection and test plan has to say where work stops. A hold point is not passed until the named party records a release. A witness point requires notice, and the work may continue if the witness does not attend. Covering a weld, closing a vessel or burying a joint without that record is a non-conformance, even if the work was sound.

    5. 5.Shutdowns and turnarounds

      Operating oil and gas assets are maintained in planned stops. The window is fixed, the workforce is temporary, and scope found when equipment is opened has to be accepted or rejected against the hours left. Controls software that assumes a multi-year construction curve, and a monthly report, is a poor fit for an event run by the shift.

    6. 6.Change versus contingency

      Contingency is for uncertainty inside the agreed scope. A variation changes scope, price or time. Software that lets either one move the forecast without a record of who approved it is difficult to defend in a dispute or an audit. The approval, the cost effect and the schedule effect belong on the same change.

    7. 7.The schedule you already have

      A new Gantt chart is not a reason to leave Primavera P6. Import, a preview of what a re-import will change, float and the critical path next to the cost position are the practical tests. A critical path calculated from missing activity logic is not a reliable finish date.

    8. 8.Who did what

      Hold-point releases, variation approvals and document issues need a person, a time and the revision they acted on. Role-based access matters because the owner, the EPCM and each contractor are not one organisation. A shared spreadsheet does not keep that record by role.

    In the room

    Questions to ask before you commit

    • Can cost and progress be reported at the same cut-off date, without an export to a workbook?
    • When a variation is approved, what happens to the budget and to the schedule, and who approved it?
    • Who can release a hold point, and is the release a record or a status someone can edit later?
    • Can we import a P6 XER, and can we see what a second import would change before it is applied?
    • How is a turnaround handled differently from a multi-year capital project in the same system?
    • What is available at launch, and what is still on the roadmap? Ask this of every vendor, including Strataverra.
    • Where is each organisation's data kept, and can one contractor see another's records?

    Where Strataverra fits

    Strataverra is project controls software for capital projects. It is not a carbon-credit registry, and it is not a generic task manager. The company is Australian. The product launches first for EPCM projects and for shutdowns and turnarounds, which is the work this page describes. A dedicated oil and gas project type, with its own terminology and templates, is on the roadmap.

    What the launch is being built to cover: a schedule with float and the critical path, including import of Primavera P6 XER files and Microsoft Project files; budgets, commitments, actual cost, earned value and forecasts from physical progress; variations with a cost and schedule effect; document revisions and transmittals; inspection and test plans with hold and witness points, and non-conformances; a risk register next to contingency. Early access is a list for launch updates. It does not turn the product on.

    What this page will not do is score other companies, quote their prices, or claim a customer result we cannot show. If a capability is still being built, the feature pages say so. Bring a real XER and a real variation to any conversation, and treat a roadmap item as a roadmap item.

    Questions about the category

    What should project controls software do on an oil and gas capital project?

    It should keep the budget, the schedule, progress, document revisions, inspection hold points and changes on one baseline, at one cut-off date. Oil and gas capital work is often delivered as EPCM. In that model the owner usually holds the construction contracts, and operating assets are maintained through shutdowns and turnarounds. A tool that only runs a task list does not cover that.

    Is there one best project controls system for oil and gas?

    No. The useful question is which system can report cost and progress at the same date, record who released a hold point, and show an approved variation in both the budget and the schedule. A ranked list that does not show those tests is not a basis for a decision.

    How is this different from construction software aimed at builders?

    Software aimed at building contractors is often organised around head-contract administration, site diaries and progress claims. Oil and gas capital work can add an EPCM firm between the owner and many contractors, long-lead procurement, and turnarounds on an operating plant. The controls question is whether the owner can see across those contracts, not only one builder's job cost.

    Does Strataverra replace Primavera P6?

    No. Import of a Primavera P6 XER, including a preview of what a re-import would change, and import and export of Microsoft Project files, are part of what is being built for launch. They are not something you can use on a live project today. The point is to put that schedule next to cost, documents and quality, not to force planners off the tool they already use.

    Is Strataverra available for oil and gas projects now?

    Strataverra is launching soon, first for EPCM projects and for shutdowns and turnarounds. Those are the delivery models used on oil and gas capital work and on operating assets. A dedicated oil and gas project-type configuration is on the roadmap. Joining the early access list is a request for updates. It is not access to the software.

    See it against your own controls

    Strataverra is launching first for EPCM and for shutdowns and turnarounds. Join the early access list for updates, or take the 3-minute project controls checkup.